Navillus Inc

Hugh L. Carey Tunnel – Prototype Motor Replacement

[vc_row][vc_column width=”1/2″][vc_column_text]

Hugh L. Carey Tunnel Prototype Motor Replacement

Brooklyn & New York, NY

Building Use: Infrastructure
Owner/Developer: Triboro Bridge & Tunnel Authority, MTA
Architect: STV
Completion Date: 2017

Navillus replaced the old fan motors with new motors at three different Ventilation buildings of the tunnel as part of prototype replacement project for a future more expansive program. Some of the motors had to be transported by barge and tugboat due to the location at Governors Island.[/vc_column_text][us_sharing facebook=”1″ twitter=”1″ gplus=”1″ linkedin=”1″ pinterest=”1″][/vc_column][vc_column width=”1/2″][us_image_slider ids=”1171,1172,1173″][/vc_column][/vc_row]

Leave a Reply

Your email address will not be published. Required fields are marked *

Scroll to Top