[vc_row][vc_column width=”1/2″][vc_column_text]
Hugh L. Carey Tunnel – Ventilation & Fire Suppression Systems Repair
Brooklyn & New York, NY
Building Use: Infrastructure
Owner/Developer: Triboro Bridge & Tunnel Authority, MTA
Engineer: Shenoy Engineering
Completion Date: December 2021
For this infrastructure project, Navillus will rehabilitate the tunnel’s ventilation system, replacing old fan motors with new custom-designed motors in addition to installing a state-of-the-art prototype for a Fixed Fire Suppression System (FFSS).[/vc_column_text][us_sharing facebook=”1″ twitter=”1″ gplus=”1″ linkedin=”1″ pinterest=”1″][/vc_column][vc_column width=”1/2″][us_image_slider ids=”2858,2942,1171,2857″][/vc_column][/vc_row]