New York, NY
Building Use: Infrastructure
Owner/Developer: New York City Housing Authority
Completion Date: 2024
Navillus designed and installed a pneumatic waste collection system serving four residential buildings at Polo Grounds Towers, conveying municipal waste to a new on-site Central Terminal Building (CTB). The system connected existing vertical trash chutes to a 22-inch-diameter underground pipe network that transported waste to the CTB, where it was mechanically compacted into DSNY containers for off-site removal. Navillus also delivered dedicated waste rooms to enable recycling segregation and scheduled transport. The CTB was constructed as a cast-in-place concrete structure and includes a green roof.

Brooklyn & New York, NY
Building Use: Infrastructure
Owner/Developer: Triboro Bridge & Tunnel Authority, MTA
Engineer: Shenoy Engineering
Completion Date: December 2021
For this infrastructure project, Navillus will rehabilitate the tunnel’s ventilation system, replacing old fan motors with new custom-designed motors in addition to installing a state-of-the-art prototype for a Fixed Fire Suppression System (FFSS).