Building Use: Residential
Owner/Developer: New York City Housing Authority
Completion Date: 2023

Removal of existing building mechanical and electrical systems, piping, and wiring; including boilers, related heating plant equipment, and instantaneous domestic hot water systems. Phasing and coordination of new equipment installation and tie-in of new work to the building distribution systems. Installation of new boiler plant mechanical equipment, including six new boilers (two 300HP and four 400HP) as scheduled, including gas-fired burners and all auxiliary equipment, piping, controls, etc., to be located in existing boiler room space in building No. 10.[/vc_column_text][us_sharing facebook=”1″ twitter=”1″ gplus=”1″ linkedin=”1″ pinterest=”1″][/vc_column][vc_column width=”1/2″][us_image_slider ids=”2882,2880,2898,2885,2886″][/vc_column][/vc_row]