RFK Bridge
Bronx & Queens, NY
Building Use: Infrastructure
Owner/Developer: Triboro Bridge & Tunnel Authority
Architect: Multiple
Completion Date: 2016
Navillus has performed numerous contracts for the TBTA at the RFK Bridge involving the restoration and renovation on this bridge formally called the Triborough Bridge includes Concrete Deck Replacement , Spall Repairs at Bridge piers , Installation of Bridge master wearing surface, Traffic Light installation at 127th Street, and Flooring of Fleet Garage under the bridge.