Navillus Inc

General Contracting Featured

138th Street & Grand Concourse Station

[vc_row][vc_column width=”1/2″][vc_column_text] 138th Street & Grand Concourse Station Bronx, NY Building Use: Infrastructure Owner/Developer:  Metropolitan Transportation Authority Completion Date:  2021 The rehabilitation of 138th Street & Grand Concourse Station included station upgrades and structural repairs of the station that first opened in 1918. The scope of work consisted of platform edge replacement, new platform concrete […]

138th Street & Grand Concourse Station Read More »

Hugh L. Carey Tunnel – Ventilation & Fire Suppression Systems Repair

[vc_row][vc_column width=”1/2″][vc_column_text] Hugh L. Carey Tunnel – Ventilation & Fire Suppression Systems Repair Brooklyn & New York, NY Building Use: Infrastructure Owner/Developer: Triboro Bridge & Tunnel Authority, MTA Engineer: Shenoy Engineering Completion Date: December 2021 For this infrastructure project, Navillus will rehabilitate the tunnel’s ventilation system, replacing old fan motors with new custom-designed motors in

Hugh L. Carey Tunnel – Ventilation & Fire Suppression Systems Repair Read More »

PS K280 Educational Campus (Brooklyn)

[vc_row][vc_column width=”2/3″][vc_column_text] PS K280 Educational Campus (Brooklyn) 500 19th street, Brooklyn, NY Building Use: Educational Owner/Developer: New York City School Construction Authority Architect: CTA Architects Completion Date: 2020 Navillus was hired as the General Contractor to perform the renovation and upgrades to an existing NYCSCA School Campus. This building holds 5 separate schools under the

PS K280 Educational Campus (Brooklyn) Read More »

Redfern Houses – Sandy Recovery & Resiliency Project

[vc_row][vc_column width=”1/2″][vc_column_text] Redfern Houses – Sandy Recovery & Resiliency Project Queens, NY Building Use: Residential Owner/Developer: New York City Housing Authority Completion Date: 2021 Navillus engaged in a 9-building project at the Redfern Houses in Far Rockway. The project included roof replacement and new entrances at all 9 buildings, 5 new electric service buildings, and

Redfern Houses – Sandy Recovery & Resiliency Project Read More »

Ocean Bay Houses – Sandy Recovery & Resiliency Project

[vc_row][vc_column width=”1/2″][vc_column_text] Ocean Bay Houses Queens, NY Building Use: Residential Owner/Developer: New York City Housing Authority Architect: Mdszerbaty + Associates Completion Date: August 2017 As part of the Hurricane Sandy restoration program, Navillus was hired as the General Contractor responsible for the flood mitigation of the complex involving new generators placed on the roofs of

Ocean Bay Houses – Sandy Recovery & Resiliency Project Read More »

Astoria Houses – Sandy Recovery & Resiliency Project

[vc_row][vc_column width=”1/2″][vc_column_text] Astoria Houses – Sandy Recovery & Resiliency Project Queens, NY Building Use: Residential Owner/Developer: New York City Housing Authority Completion Date: April 2022 For this contract with NYCHA, Navillus was in charged to perform the following work: Resiliency • Manually dry flood proof areas below the FEMA flood level. Safety • Install upgraded

Astoria Houses – Sandy Recovery & Resiliency Project Read More »

Smith Houses – Sandy Recovery & Resiliency Project

[vc_row][vc_column width=”1/2″][vc_column_text] Smith Houses – Sandy Recovery & Resiliency Project New York, NY Building Use: Residential Owner/Developer: New York City Housing Authority Completion Date: November 2021 Our Smith Houses project was part of the Recovery and Resilience Program of New York City Housing Authority after Hurricane Sandy hit in 2012. The Scope of Work included

Smith Houses – Sandy Recovery & Resiliency Project Read More »

Hugh L. Carey Tunnel Prototype Motor Replacement

Hugh L. Carey Tunnel – Prototype Motor Replacement

[vc_row][vc_column width=”1/2″][vc_column_text] Hugh L. Carey Tunnel Prototype Motor Replacement Brooklyn & New York, NY Building Use: Infrastructure Owner/Developer: Triboro Bridge & Tunnel Authority, MTA Architect: STV Completion Date: 2017 Navillus replaced the old fan motors with new motors at three different Ventilation buildings of the tunnel as part of prototype replacement project for a future

Hugh L. Carey Tunnel – Prototype Motor Replacement Read More »

Queens Midtown Tunnel - Demolition of Garage C

Queens Midtown Tunnel – Demolition of Garage C

[vc_row][vc_column width=”1/2″][vc_column_text] Queens Midtown Tunnel – Demolition of Garage C New York, NY Building Use: Infrastructure Owner/Developer: Triboro Bridge & Tunnel Authority Completion Date: 2016 Navillus performed the contract to improve traffic flow at the midtown tunnel including the demolition work of the Garage buildings in Manhattan.[/vc_column_text][us_sharing facebook=”1″ twitter=”1″ gplus=”1″ linkedin=”1″ pinterest=”1″][/vc_column][vc_column width=”1/2″][us_image_slider ids=”1184,1185″][/vc_column][/vc_row]

Queens Midtown Tunnel – Demolition of Garage C Read More »

RFK - Credit Thornton Tomasetti Weidlinger for photo

RFK Bridge

[vc_row][vc_column width=”1/2″][vc_column_text] RFK Bridge Bronx & Queens, NY Building Use: Infrastructure Owner/Developer: Triboro Bridge & Tunnel Authority Architect: Multiple Completion Date: 2016 Navillus has performed numerous contracts for the TBTA at the RFK Bridge involving the restoration and renovation on this bridge formally called the Triborough Bridge includes Concrete Deck Replacement , Spall Repairs at Bridge piers , Installation

RFK Bridge Read More »

Scroll to Top