Navillus Inc

Tile & Stone Featured

Grand Central Madison Terminal

[vc_row][vc_column width=”1/2″][vc_column_text] Grand Central Madison Terminal New York, NY Building Use: Infrastructure Owner/Developer: Metropolitan Transportation Authority Client:  GCT Constructors, JV Completion Date:  September 2021 At the Grand Central Station – Long Island Railroad – East Side Access, Navillus installed over 50,000 SF of marvelous glass tiles, ceramic tiles, and stone. Over 20,000 SF of glass […]

Grand Central Madison Terminal Read More »

Grand Central Station

[vc_row][vc_column width=”1/2″][vc_column_text] Grand Central Station New York, NY Building Use: Infrastructure Owner/Developer: Midtown TDR Ventures Completion Date: 2001 As part of the rehabilitation of the Grand Central Station, which is part of the largest underground transportation system in the world, Navillus performed the demolition and installation of new platforms, rubbing boards along the tracks during

Grand Central Station Read More »

138th Street & Grand Concourse Station

[vc_row][vc_column width=”1/2″][vc_column_text] 138th Street & Grand Concourse Station Bronx, NY Building Use: Infrastructure Owner/Developer:  Metropolitan Transportation Authority Completion Date:  2021 The rehabilitation of 138th Street & Grand Concourse Station included station upgrades and structural repairs of the station that first opened in 1918. The scope of work consisted of platform edge replacement, new platform concrete

138th Street & Grand Concourse Station Read More »

Cortlandt Subway Station

[vc_row][vc_column width=”1/2″][vc_column_text] Cortlandt Subway Station New York, NY Building Use: Infrastructure Owner/Developer: Metropolitan Transportation Authority Architect: Downtown Design Partnership Completion Date: 2019 This is a new subway station that Navillus takes pride to have worked on. We installed the masonry as well as the granite paving and marble on the walls.[/vc_column_text][us_sharing facebook=”1″ twitter=”1″ gplus=”1″ linkedin=”1″

Cortlandt Subway Station Read More »

2nd Avenue Subway Line

2nd Avenue Subway Line

[vc_row][vc_column width=”1/2″][vc_column_text] 2nd Avenue Subway Line, 72nd Street & 96th Street Stations New York, NY Building Use: Infrastructure Owner/Developer: City of New York Architect: MTA Completion Date: 2016 Navillus helped construct three stations along the new Second Avenue subway line, which opened January 1, 2017. The three new stations, 72nd, 86th and 96th streets allowed

2nd Avenue Subway Line Read More »

World Trade Center

World Trade Center

[vc_row][vc_column width=”1/2″][vc_column_text] World Trade Center New York, NY Building Use: Commercial Owner/Developer: Port Authority of New York and New Jersey Architect: Skidmore, Owings & Merrill (SOM) Completion Date: 2014 Navillus was brought in as the concrete contractor to complete the building of the 1776 foot high tower at the World Trade Center. We also were hired to

World Trade Center Read More »

Madison Square Garden

[vc_row][vc_column width=”1/2″][vc_column_text] Madison Square Garden New York, NY Building Use: Commercial Owner/Developer: The Madison Square Garden Company Architect: Charles Luckman Associates, Brisbin Brook Beynon Architects Size: 820,000 square feet Completion Date: 2013 Under grueling time constraints, Navillus championed the completion of a series of major upgrades to Madison Square Garden. Home of the New York

Madison Square Garden Read More »

Apple Flagship Store

[vc_row][vc_column width=”2/3″][vc_column_text] Apple Flagship Store 767 Fifth Avenue New York, NY Building Use: Commercial Owner/Developer: Kaufman Organisation // GC: Unity Architect: Bohlin Cywinski Jackson Size: 32,000-square-feet Completion Date: 2012 Navillus performed all the stone flooring and tile for the first Apple store on Manhattan. The work was personally inspected and approved by the Apple CEO

Apple Flagship Store Read More »

Resorts World Casino

[vc_row][vc_column width=”2/3″][vc_column_text] Resorts World Casino Queens, NY Building Use: Commercial Owner/Developer: Genting Malaysia Berhad Architect: JCJ Architecture Size: 330,000-square-foot Completion Date: 2011 Navillus performed the stone and tile work for New York Citys first Casino. The work was done within a very aggressive construction schedule where quality and speed both counted.[/vc_column_text][us_sharing facebook=”1″ twitter=”1″ gplus=”1″ linkedin=”1″

Resorts World Casino Read More »

Brooklyn Children’s Museum Brooklyn

Brooklyn Children’s Museum Brooklyn

[vc_row][vc_column width=”2/3″][vc_column_text] Brooklyn Children’s Museum Brooklyn, NY Building Use: Commercial Architect: Rafael Vinoly Completion Date: 2008 Navillus was thrilled to lend its tiling expertise to New York City’s first children’s museum, a stunning achievement in aesthetics, innovation and design. Using LATICRETE, the world leader of ceramic tile and stone installation systems, Navillus project team installed

Brooklyn Children’s Museum Brooklyn Read More »

Scroll to Top